The RWAD AL GOSOOR Experience

Scroll to watch a site go from standing structure to a clean, level plot — told entirely in blocks.

02 / 06

Every project starts with a structure

We survey the building, its services and its surroundings, then write the method statement before a single block moves.

03 / 06

Controlled demolition

Heavy machinery takes the structure down top-down, in sequence, with exclusion zones and water suppression.

04 / 06

Sorted for recycling

Concrete, brick and steel are separated on site. Recoverable steel is valued and deducted from your cost.

05 / 06

Level and ready

Debris goes to an approved landfill and the land is levelled — a clean plot, handed back on schedule.

06 / 06

Ready for what’s next

Your site is clear. Now it’s time to build.

Scroll to begin
Rubble ready for sorting
Levelled site ready for handover
During demolitionSite cleared

BEFORE & AFTER

From Standing Structure to Clear Site

Keep scrolling to clear the site

TracksGrip and stability on rubble and uneven ground.
Upper structureRotates 360° to work in every direction.
CounterweightBalances the machine when the arm is fully loaded.
Operator cabProtected cab with a full view of the work zone.
BoomThe main arm that lifts and positions the attachment.
StickExtends reach and pulls material towards the machine.
AttachmentBucket, breaker, grab or shears — swapped for each job.
Hydraulic cylindersDeliver the force behind every movement.

THE MACHINE, UP CLOSE

Built for Heavy Work

Scroll to take our excavator apart — and see what each part does on a demolition site.

A DAY ON SITE

From First Light to Site Secured

Scroll through a typical working day on one of our demolition sites.

06:30
06:30

Toolbox talk

The crew reviews the day’s plan, hazards and PPE before anyone starts work.

07:00

Site inspection

Exclusion zones, hoarding and access routes are checked and secured.

07:30

Utilities verified

Power, water and gas isolation is confirmed — every single morning.

08:00

Machine checks

Excavators, breakers and loaders get their daily pre-start inspections.

09:00

Top-down demolition

The structure comes down floor by floor, in the planned sequence.

12:00

Dust & heat control

Water suppression stays on, and crews rest through the hottest hours in summer.

14:00

Sorting & scrap

Steel, concrete and brick are separated for recycling and reuse.

16:00

Haulage

Sorted debris is transported to approved landfill and recycling sites.

17:30

Site secured

The site is made safe, fenced and the daily progress report is sent.

FLOOR BY FLOOR

Top-Down. Controlled. Every Time.

Top-down, alwaysWe start at the roof and work down, so the structure stays stable.
Sorted as it fallsConcrete, steel and brick are separated floor by floor.
Ground level, site clearThe last slab is removed and the plot is levelled for handover.
18floors standing
Site cleared 0%