Demolition Services in Riyadh & Saudi Arabia

End-to-end demolition solutions — from the first site survey to a clean, level plot ready for construction.

Plot cleared for redevelopment
01

Industrial Demolition

Factories, warehouses, gas stations and industrial facilities dismantled safely — with steel recovered, foundations removed and the site handed back clean.

  • Factories and production plants
  • Large warehouses and storage yards
  • Gas stations and fuel facilities
  • Steel structures and concrete foundations
Rubble ready for sorting
02

Old Building Demolition

Old buildings and apartment blocks removed safely — clearing the land for redevelopment and reconstruction projects.

  • Old apartment buildings
  • Unsafe and abandoned structures
  • Buildings before redevelopment
  • Reconstruction projects
Excavator working on a demolition site
03

Villa Demolition in Riyadh

Villas, palaces and annexes in Riyadh demolished with care for neighbours — then cleared, levelled and handed back ready to build.

  • Villas and duplexes
  • Palaces and large residences
  • Annexes, pools and boundary walls
  • Plots in residential neighbourhoods
Site clearing in progress
05

House Demolition in Jeddah

Houses, villas and old buildings in Jeddah demolished safely — with debris removed and the land levelled for your next project.

  • Houses and villas in Jeddah
  • Old residential buildings
  • Shops and small commercial buildings
  • Plots before redevelopment
Basement and foundation works
06

Wall Demolition

Boundary walls, internal walls and concrete bases removed precisely — without damaging the structure you are keeping.

  • Boundary walls and fences
  • Internal and partition walls
  • Block, brick and concrete walls
  • Concrete bases and footings
Demolition and rubble sorting
07

Commercial Demolition

Shopping malls, hotels, towers and office buildings demolished in planned phases — safely, on schedule and with minimum disruption.

  • Shopping malls and showrooms
  • Hotels and hotel projects
  • Towers and office buildings
  • Government buildings
Levelling a cleared plot
08

Demolition & Debris Removal

Demolition with debris removal included — rubble sorted, hauled to an approved landfill, and the land handed back level and clean.

  • Demolition with debris removal in one price
  • Rubble sorting and recycling on site
  • Transport to approved landfill only
  • Land levelling and clean site handover
Excavation and foundation removal
09

Concrete Breaking & Levelling

Reinforced concrete, foundations and slabs broken out with hydraulic breakers — then the plot levelled and ready for your new build.

  • Reinforced concrete buildings and structures
  • Raft foundations, bases and footings
  • Concrete slabs, floors and retaining walls
  • Rebar separation and land levelling
Scrap steel loaded for recycling
010

Scrap Purchase & Demolition

We value and buy the steel, aluminium, copper and fittings in your building before demolition — and in many cases carry out the demolition in exchange for the scrap.

  • Steel, aluminium, copper and cables
  • Tanks, doors, windows and fittings
  • Factory equipment and hotel contents
  • Demolition in exchange for scrap available
Large building demolition
011

Government & Major Projects

Towers, shopping malls, hotels, petrol stations, government buildings and large warehouses — demolished to programme, with full documentation.

  • Towers, apartment blocks and multi-storey buildings
  • Shopping malls, hotels and commercial complexes
  • Government buildings and public facilities
  • Petrol stations, large warehouses and industrial plants

EVERY PROJECT

What’s Included
as Standard

Whatever the size of the job, these steps are part of how we work — not optional extras.

01

Site survey & method statement

A detailed visit, structural review and written demolition plan.

02

Permits & authority approvals

Paperwork prepared and coordinated before work begins.

03

Utility isolation

Power, water and gas safely disconnected with providers.

04

Dust, noise & traffic control

Screens, water suppression and planned working hours.

05

Waste sorting & recycling

Materials separated on site and sent to approved facilities.

06

Clean, level handover

A safe, cleared plot ready for the next phase of work.

FAQ

Questions,
Answered

Can’t find what you need? Our team will walk you through your project.

Ask a Question

Yes. We work as an approved demolition contractor and handle demolition permits and coordination with the authorities and utility providers before any work starts.

Yes. We value recoverable steel and metal and deduct it from the demolition cost — in many cases the demolition can be done in exchange for the scrap.

Yes. We sort the debris on site, transport it to an approved landfill, level the land and hand over a clean site.

It depends on the size, type and location of the building. After a site visit we give you a clear schedule — from a few days for villas to several weeks for large apartment buildings and factories.

Yes. We demolish government buildings, towers, shopping malls and industrial facilities with heavy machinery and written safety plans.

We work in Riyadh, Jeddah, Dammam, Khobar, Makkah, Madinah, Jubail and all regions of Saudi Arabia.

Planning a demolition project?

Speak with our team for a site visit and a free, detailed quote.

✓Message sent. We’ll reply within one working day.